Big projects can require big solutions, and the $400 million expansion of the Tilbury liquefied natural gas (LNG) plant in Delta, B.C., certainly qualifies as a big project. FortisBC broke ground on the project in October 2014 and expects to commence operation by the end of 2016. The site requires electric power – and a lot of it – to keep office trailers, cranes and construction tools running during construction, a need Trinity was able to fill quickly to meet a very tight deadline.

200x400 Substation Banner In their planning phase, construction managers determined that grid supplied, hydro-produced power would be significantly less expensive than electricity produced onsite with generators. But with only a two-month window for design, delivery and installation, they needed equipment and support from Trinity Power to get a 2MVA substation in place.

This was no simple equipment-supply project. During Pre-mobilization and to meet jobsite specific requirements, Trinity Power worked closely with our customer’s electrical engineers to customize the substation. Additionally, Trinity was responsible for helping the customer meet a range of onsite and off-site requirements, including:

  • Factory and Site acceptance tests.
  • Ground-grid design and installation (including an above-ground, framed-in ground grid).
  • Onsite commissioning (including the Grounding Resistance Test and Step & Touch report).
  • Organizing ongoing quarterly maintenance for the duration of the rental period.

This is a long-term rental, anticipated to last at least two years. The alternative for construction managers was to purchase a custom-manufactured substation – but this customer didn't want the added maintenance responsibilities or storage issues after the project’s completion. Instead, with this temporary-power solution, they gain access to inexpensive and reliable grid-supplied power, with the added peace of mind knowing that all maintenance and logistics will be handled by Trinity Power, a partner they know they can trust.


By checking this box you are giving Trinity Power express consent to send you commercial emails.


Energy in Canada: What's In Store for 2017?
Learn More

Generator Fuel: Diesel, Natural Gas, or Both?
Learn More

How Hakai Research Institute’s Calvert Island Station Cut Their Generator Fuel Consumption by 80%
Learn More

LNG Export 2016 Conference and Exhibition is Coming to Vancouver
Learn More

Nanotechnology Making Big Waves in Thermoelectric Generation
Learn More