Our approach, developed over decades of experience, is fine-tuned to get the results you want.
We deliver concept-to-completion solutions, designed by temporary power specialists with access to the largest inventory of high-quality power generation and distribution equipment in North America.
From a wide range of diesel and natural gas generators to transformers, cable, light towers and more, our large rental fleet and extensive vendor network ensure we’ll have the temporary power equipment that your project requires — every time.
For nearly 20 years, we have been at work powering projects across Canada’s industrial sectors.
Select from this sampling of industries to learn how we can put our expertise to work for you.
VIEW ALLFrom our inception in 1998, we have been building our team on a foundation of excellence. Our team members’ passion, expertise and commitment are what have allowed us to grow into a national company with projects across Canada.
Click on the links to learn more about our history, our team or our career opportunities.
“Temporary” isn’t always so, well, temporary, when it comes to power needs, as a recent Trinity Power project in Vancouver proves. In this case Trinity Power was called on to provide equipment for a major construction site for a job that could last up to two years. Thanks to Trinity’s available inventory and talented staff, this long-term installation was at the site in a fraction of the time and cost it would have taken to custom build equipment to meet the client’s needs.
The project – the construction of a $535 million casino in BC’s Lower Mainland – is sure to become a destination for Vancouver visitors and residents, alike. The construction combines a 72,000-sq.-ft. gambling floor with 550 guest rooms (in two separate hotels), along with all the amenities such facilities provide. The project’s electrical contractor came to Trinity Power in search of a 2000kVa, 12.5kV – 600V transformer that could connect to BC Hydro’s grid for the two years or so needed to build this urban resort.
The power to be supplied by the new substation was critical to the project’s progress, and the construction team didn’t have the time for a new unit to be custom built from scratch. So, instead, Trinity’s team worked closely with the electrical contractor’s staff, along with the project’s engineering firm, general contractor and BC Hydro, to modify an existing substation with a non-standard entrance cubicle. The equipment was ready to ship in just three weeks and the equipment modification met all Municipal and Utility requirements. Coordination of logistics (crane & landing) and permitting (lane closures) was managed by Trinity Power as well.