Big projects can require big solutions, and the $400 million expansion of the Tilbury liquefied natural gas (LNG) plant in Delta, B.C., certainly qualifies as a big project. FortisBC broke ground on the project in October 2014 and expects to commence operation by the end of 2016. The site requires electric power – and a lot of it – to keep office trailers, cranes and construction tools running during construction, a need Trinity was able to fill quickly to meet a very tight deadline.

200x400 Substation Banner In their planning phase, construction managers determined that grid supplied, hydro-produced power would be significantly less expensive than electricity produced onsite with generators. But with only a two-month window for design, delivery and installation, they needed equipment and support from Trinity Power to get a 2MVA substation in place.

This was no simple equipment-supply project. During Pre-mobilization and to meet jobsite specific requirements, Trinity Power worked closely with our customer’s electrical engineers to customize the substation. Additionally, Trinity was responsible for helping the customer meet a range of onsite and off-site requirements, including:

  • Factory and Site acceptance tests.
  • Ground-grid design and installation (including an above-ground, framed-in ground grid).
  • Onsite commissioning (including the Grounding Resistance Test and Step & Touch report).
  • Organizing ongoing quarterly maintenance for the duration of the rental period.

This is a long-term rental, anticipated to last at least two years. The alternative for construction managers was to purchase a custom-manufactured substation – but this customer didn't want the added maintenance responsibilities or storage issues after the project’s completion. Instead, with this temporary-power solution, they gain access to inexpensive and reliable grid-supplied power, with the added peace of mind knowing that all maintenance and logistics will be handled by Trinity Power, a partner they know they can trust.

SUBSCRIBE FOR ACCESS TO EXCLUSIVE CONTENT.

By checking this box you are giving Trinity Power express consent to send you commercial emails.

RELATED POSTS

Energy in Canada: What's In Store for 2017?
Learn More

Generator Fuel: Diesel, Natural Gas, or Both?
Learn More

How Hakai Research Institute’s Calvert Island Station Cut Their Generator Fuel Consumption by 80%
Learn More

LNG Export 2016 Conference and Exhibition is Coming to Vancouver
Learn More

Nanotechnology Making Big Waves in Thermoelectric Generation
Learn More