Trinity Goes the Distance To Power A Gas Plant Project

  • Location: Dawson Creek, B.C.
  • Project Type: Oil & Gas

What does it take to deliver a bid-winning temporary power solution? In the case of our recent project at a phase III gas plant, the answer is: 2 designs, 5 vendors including Trinity Power, and 8 equipment locations spread across North America.

Independent Electric and Controls Ltd. (IEC) has been providing electrical and instrumentation services in Western Canada since 2003. Specializing in services that range from automation and controls system maintenance to plant expansions and upgrades, IEC prides itself on the quality of the service they provide to their clients.

One such client, ARC Resources, needed to commission the backup system for their nearly-completed phase III gas plant in Dawson Creek. In order to do that, they needed a temporary power system that would enable them to load test two 10MW 4160V turbines. This was no simple task since there are only a few load banks in North America that can handle that kind of load.

But Trinity Power was up to the task. After speaking with our vendors across North America, we designed two different solutions, ultimately settling on the most cost-effective option:

We tied the two turbines into existing switchgear, running 200 feet of single conductor 5kV 500 MCM cable into a 1400A 5kV rated bus. From there, we had 3 more 100 foot lengths of 5kV 500 MCM cable running into each 4MVA 4160V resistive load bank.

We also supplied a 500kW 480V generator, complete with distribution and cabling, to feed the required 200A 480V shore power for each load bank.

In order to supply all of the equipment required for this system, we tapped into our vendor network as well as our own fleet. Ultimately, we sourced the necessary equipment from five different companies, bringing it in from 8 different cities across North America from Dallas, Texas to Mississauga, Ontario to Pomona, California.

Thanks to Trinity’s extensive network and commitment to delivering the best temporary power system for the job, this far-ranging solution is in place, ensuring that the plant’s commissioning is underway and on schedule.

Trinity Power Rentals Case Studies

Explore Posts By Category

Facebook Feed

Trinity Power Rentals added 3 new photos.

Kurt and Dustin @Ontario Electrical League Industry conference. Have a good night guys.
... See MoreSee Less

3 weeks ago

View on Facebook

Kurt with Lianne Ransom, winner of our little draw at Minerals North 2017... congrats Lianne! ... See MoreSee Less

4 weeks ago

View on Facebook

Newsletter

Join Trinity Power’s Monthly Newsletter

By checking this box you are giving Trinity Power Rentals express consent to send you commercial electronic messages. This includes:
  • > Relevant & Insightful Articles
  • > Equipment Line News & Videos
  • > Industry News & Reports
  • > Promotional Type Email
I consent

Most Popular Articles

  • 4 Ways to Reduce Your Global Adjustment Costs read more >
  • Case Study: A Generator-Free Film Set read more >
  • Trinity Power and Litespan Electrical Inc Provide Quick Solution to Power Emergency read more >
From the Blog
An Emergency Power Checklist for Business

Is Your Business Prepared For a Power Outage?

Spring has arrived and, with it, unpredictable weather and the power outages that often follow. As recently as April 7th, a snow and wind storm caused a major outage in Ontario that affected 45,000 residents. Meanwhile, the spring melt in BC is see...

Gas Plant Case Study

Trinity Goes the Distance To Power A Gas Plant Project

What does it take to deliver a bid-winning temporary power solution? In the case of our recent project at a phase III gas plant, the answer is: 2 designs, 5 vendors including Trinity Power, and 8 equipment locations spread across North America. ...

YVR Jet Fuel Delivery Solution

Fuel Delivery System Construction Underway For YVR

With over 20,000 runway movements and 1.6 million passengers coming and going in February alone, the Vancouver International Airport sees a lot of air traffic. Fueling that air traffic is no small feat. Currently, fuel arrives at the airport b...

NEED POWER?
WE CAN HELP
CALL US NOW:
1-888-PLUG-N-GO
TOLL FREE
1-888-758-4646