Securing a Cost-efficient Turnaround Process for Oil Plants

With capital investment projects being the primary focus of senior management in the petroleum industry, the potential business impact of facility turnarounds is frequently underestimated or altogether disregarded. In 2013, the total capital expenditure in the Oil Sands, Alberta alone totalled $31 billion, while operating costs were not far behind at $24 billion[1]. Since the Oil Sands, and Alberta in general, has historically been a high-cost area with plenty of space for performance improvement, decreasing the share of operating costs, largely attributed to turnaround spending, should gain priority in the management decision-making process[2].

Both industry and location pose their individual challenges on turnaround efficiency in the region. The Oil Sands area petrochemical facilities have among the highest in complexity and largest in scope upgrade turnarounds in the entire industry. Since these are usually performed in windows of up to 60 days, the costs associated with upgrading operations may amount to tens of million dollars per day over the shutdown period. On the other hand, geography makes it difficult to attend to the logistics of such large projects and attracting skilled labour in the area is difficult due to the remote location and specific environment. These factors together make turnarounds in Alberta among the most expensive in the world[2].

Another major challenge of the turnaround process lies in planning ahead for plant shutdowns. Since planning should start at least 6 months prior to feed-out, it is easy to freeze the turnaround budget before examining the adequacy of scope. As a result, considerable work tasks are discovered and added even after the shutdown has begun, resulting in schedule and budget overruns. Due to the unique nature of the refining industry, a single day of lost opportunities due to poorly planned plant shutdown may significantly run in excess of the allocated maintenance budget. Finally, in looking to optimize both budget and schedule, some turnaround managers set unrealistic targets that are not aligned with the reality of the maintenance work being planned.

Based on these specific challenges petroleum plants face across Alberta, there are a number of strategies that can secure a timely and cost-efficient turnaround process.

  • Senior management involvement – If the top management does not recognize the business impact of poorly executed maintenance shutdowns, there will always be a substantial discrepancy between budgeting and scheduling and the actual costs and work involved in a turnaround.
  • Early planning – While it used to be an industry standard to start preparing for a plant shutdown 6 to 9 months in advance, recent recommendations state that a complex turnaround should take 15 to 18 months to plan effectively[2]. An early start to the planning process ensures a correct diagnosis of the necessary work, as well as procuring the necessary materials, equipment and skilled labour.
  • Smooth integration across departments – Capital projects and maintenance work need to be effectively coordinated and communicated across all levels of staff involvement. When everyone is aware of the impact of their individual and team contribution to the process, both planning and execution can be optimized in the organization.
  • Effective control over scope – Since determining the scope of the project is among the key drivers behind a successful turnaround, enough time should be devoted to identifying areas of work for each specific turnaround cycle to avoid late additions and changes, which always have an adverse effect on turnaround schedule and budget.

The petroleum sector is ever-expanding in the Oil Sands, Alberta and the competition among plants dictates effective handling of operational costs, including turnaround spending. A well-defined scope, actively involved management and a thorough, well-coordinated planning process have the potential to make a difference in each individual plant’s cost-effectiveness.

Sources:

1. Canadian Association of Petroleum Producers, Statistical Handbook, October 2014
2. Schroeder, Brett, and John Crager. "The Importance of Turnarounds to Business Success for the Oil Sands." Asset Performance Canada (n.d.): n. pag.

Get Prepared

Call Toll Free 1-888-758-4646 to speak with a power specialist about the next step in becoming emergency prepared.

OR

Submit this form and a Trinity Power specialist will arrange an appointment to discuss further.

Explore Posts By Category

Facebook Feed

Trinity Power Rentals shared NHL Trash Talkers's photo.

LET’S GO OILERS!
... See MoreSee Less

Game 2 Oilers vs Ducks goes tonight The Oil are up 1-0 in the series. Will they make it 2-0? #GrandLarssony

24 hours ago

View on Facebook

Kurt with Lianne Ransom, winner of our little draw at Minerals North 2017... congrats Lianne! ... See MoreSee Less

2 days ago

View on Facebook

Newsletter

Join Trinity Power’s Monthly Newsletter

By checking this box you are giving Trinity Power Rentals express consent to send you commercial electronic messages. This includes:
  • > Relevant & Insightful Articles
  • > Equipment Line News & Videos
  • > Industry News & Reports
  • > Promotional Type Email
I consent

Most Popular Articles

  • 4 Ways to Reduce Your Global Adjustment Costs read more >
  • Case Study: A Generator-Free Film Set read more >
  • Trinity Power and Litespan Electrical Inc Provide Quick Solution to Power Emergency read more >
From the Blog
An Emergency Power Checklist for Business

Is Your Business Prepared For a Power Outage?

Spring has arrived and, with it, unpredictable weather and the power outages that often follow. As recently as April 7th, a snow and wind storm caused a major outage in Ontario that affected 45,000 residents. Meanwhile, the spring melt in BC is see...

Gas Plant Case Study

Trinity Goes the Distance To Power A Gas Plant Project

What does it take to deliver a bid-winning temporary power solution? In the case of our recent project at a phase III gas plant, the answer is: 2 designs, 5 vendors including Trinity Power, and 8 equipment locations spread across North America. ...

YVR Jet Fuel Delivery Solution

Fuel Delivery System Construction Underway For YVR

With over 20,000 runway movements and 1.6 million passengers coming and going in February alone, the Vancouver International Airport sees a lot of air traffic. Fueling that air traffic is no small feat. Currently, fuel arrives at the airport b...

NEED POWER?
WE CAN HELP
CALL US NOW:
1-888-PLUG-N-GO
TOLL FREE
1-888-758-4646